Critical Power Installations

...quality, cost and time.

Our power distribution teams are responsible for taking delivery, offloading, positioning, mechanically connecting, securing, conducting torque tests, terminating, cleaning, performing electrical tests, visually inspecting, energising, and commissioning the following systems:

  • Low voltage switchboard installations 630A – 6300A
  • Medium voltage switchboard installations – up to 38KVA
  • UPS, battery, DC/AC cable installations
  • Oil filled & cast resin transformer installations
  • Transformer housing & close couple electrical connections
  • Busbar installations
  • Continuity, insulation resistance, low ohms, phase rotation, flash and pressure testing
  • Primary, secondary injection testing, software commissioning for relay protection
  • LV & MV cable installation and termination
  • Generator Installations


Our Project Engineering teams play a vital role in supporting all our site installation services, overseeing the entire lifecycle of our projects. This forms the foundation of our site service installations.

“It is our responsibility to manage risk on behalf of our clients and ensure that all projects are delivered, safely, timely and cost effectively to a high level of quality.”